OPB METHODOLOGY
ORR Pin Bridge (Explainer Rail)
ORR is the change-control rail for this Explainer — one FFIEC stack per cvr_cycle_id, one narrative pin per pre-close deal.
Deal teams should recognize these TRNSFM markings; OPB foots them at the Explainer cut plane for client-side audit.
Me = slice @ pin. Them = merged standalone @ pin. Post-close absorption is a lineage assumption only.
PRC bridge reads Smartmarkets LIBRARY at pin-replayed org_keys — same accretion instrument as forward minted DealCard, just with a past-tense exemplary cut.
See Prompt Chip for the production mint on your next deal. This Review Explainer trains the bridge — not production mint (you will not be able to mint this deal card; Them is already rolled under).
ORR STACK / CHANGE PLANE
Explainer Cut @ 2026-01-01
Pin 2026-01-01 · ORR-8150-bank-2026Q2-rev1 · Me org_key 811096484 · Them org_key 811132382 standalone @ pin.
Exclude transforms on or after 2026-01-02 (forward CVR).
Pre-pin stack changes (newest first):
2026-01-01 — Bsj Bancshares, Inc. → Planters Holding Company → Me stack change
2021-12-18 — Germantown Capital Corporation, Inc. → Planters Holding Company → Me stack change
2016-02-01 — Covenant Financial Corporation → Planters Holding Company → Me stack change
Internal control: PRC @ 2026-01-01 = stack after scroll above, before post-close absorption.