OPB METHODOLOGY
ORR Pin Bridge (Explainer Rail)
ORR is the change-control rail for this Explainer — one FFIEC stack per cvr_cycle_id, one narrative pin per pre-close deal.
Deal teams should recognize these TRNSFM markings; OPB foots them at the Explainer cut plane for client-side audit.
Me = slice @ pin. Them = merged standalone @ pin. Post-close absorption is a lineage assumption only.
PRC bridge reads Smartmarkets LIBRARY at pin-replayed org_keys — same accretion instrument as forward minted DealCard, just with a past-tense exemplary cut.
See Prompt Chip for the production mint on your next deal. This Review Explainer trains the bridge — not production mint (you will not be able to mint this deal card; Them is already rolled under).
ORR STACK / CHANGE PLANE
Explainer Cut @ 2026-04-30
Pin 2026-04-30 · ORR-8150-bank-2026Q2-rev1 · Me org_key 812033226 · Them org_key 815193420 standalone @ pin.
Exclude transforms on or after 2026-05-01 (forward CVR).
Pre-pin stack changes (newest first):
2026-04-01 — Boh Holdings, Inc. → South Plains Financial, Inc. → Me stack change
2023-04-02 — Rssd 3382332 → South Plains Financial, Inc. → Me stack change
2014-08-16 — Zia Financial Corporation → South Plains Financial, Inc. → Me stack change
2008-10-17 — South Plains Delaware Financial Corporation → South Plains Financial, Inc. → Me stack change
1998-12-08 — West Texas National Bancshares, Inc. → South Plains Financial, Inc. → Me stack change
1998-12-08 — Lockney Holding Company → South Plains Financial, Inc. → Me stack change
Internal control: PRC @ 2026-04-30 = stack after scroll above, before post-close absorption.